Solutions
Get site data faster than ever before
Monitor progress, calculate volumes, and share proof-of-work with unlimited stakeholders, without delays caused by traditional measurement methods or per-seat fees.
What’s slowing down construction projects
Construction site managers face challenges like:
Surveyor schedules
Waiting 1–2 weeks between flight and report means decisions get made on outdated data.
Payment disputes
Without precise documentation, verifying contractor work becomes a lengthy back-and-forth.
Survey costs
Each surveyor visit can cost €500–2,000, before you factor in the time spent waiting for results.
Limited data access
Results sit in licensed desktop software that only a handful of people on the team can open.
Fast-moving sites
By the time last week’s data arrives, the site has already moved on.
You need current information to make good decisions, but traditional methods can’t keep pace with modern construction timelines.
Compare any time periods, side-by-side
The multi-window feature lets you view several layers simultaneously in your browser. January next to March next to May next to today, all at once. Spot trends, verify progress, and catch discrepancies without toggling between files or relying on memory.
www.avagpro.com

www.avagpro.com

Calculate volumes that end arguments
Draw a polygon around any work zone and get exact cubic meter calculations in seconds. The MapClean function automatically removes vehicles, equipment, and temporary structures from your data, eliminating the #1 source of volume disputes on site. Every measurement can be exported as a PDF report, giving you a clear, defensible record that holds up in payment discussions and client reviews.
Share with everyone who needs access, at no extra cost
Site engineers, project managers, subcontractors, clients—give access to your entire team and they all see the same current data, in real time. No per-seat fees and no version confusion. Everyone works from a single source of truth, whether they’re on site or reviewing remotely.
www.avagpro.com

Construction sites
How AVAG helps construction managers
Map large areas with centimeter accuracy. Calculate volumes in seconds. Share proof-of-work with every stakeholder before the end of the day. AVAG turns drone data into the decisions your site runs on.
Learn how STRABAG measures every detail across 10.5 km of highway and processes thousands of drone images into invoice-ready earthwork documentation in hours.
processed in hours with centimeter accuracy

Your new workflow
Monday 9am
Monday 11am
Monday 2pm
Monday 3pm
Monday 4pm
Monday 5pm
Tuesday 9am
Result
Prepare your monthly report in 1 day instead of 2 weeks. Save 70-80% compared to surveyor callouts.
Benefits
Why construction teams choose AVAG
Only EU platform with DJI Dock
Automated surveys and data processing
Multi-window comparison
See several time periods simultaneously
Unlimited users
No per-seat licensing fees
Hours, not weeks
Data ready same day as flight
MapClean removes equipment
Accurate volumes without disputes
All-in-one
From upload to PDF report without switching tools
Trusted by market leaders
Start your free trial
14 days • 200 GB storage • No credit card required
Upload your drone data and see results within hours.

Solutions





